Step Six

6. From the submersible pump, a discharge line is run up the wall. Through a drilled hold in the wall, the discharge line is extended.

7. Bentonite may be dry-poured through holds drilled approximately three feet apart on exposed exterior portions of the sub-soil masonry. When Bentonite mixes with water it gels and fills any existing wall cracks.