Step One

1. Using a jack-hammer, the basement floor is opened adjacent to the wall. A trench is excavated. The width is determined by the width of the foundation footing. The depth is limited since it may not be lower than the bottom of the footing.

Leave a Reply

Your email address will not be published. Required fields are marked *